How do you do the rubble Soling?

Soling should be laid in one layer of 230mm or 150mm depth or specified thickness of soling with a tolerance of 25mm. After packing the stones properly in position, the interstices between them should be carefully filled with quarry spoils or stone chips of larger size possible to obtain a bard, compact surface.

What is meant by rubble Soling?

Soling is the process of hand packing rubble stones one adjacent to another, to provide a stable base to the foundation and footing, before concreting work. Rubble or boulder soling is done to enhance the bearing capacity of the soil, where hard strata are not available.

How do you find the rubble Soling quantity?

From part 1, the volume of excavation for the footing = 140 cu ft. From the above drawing, depth of excavation = 2.5 ft., depth of soling = 0.75 ft. The volume of soling for the footing. = ( 0.75 ft ÷ 2.5 ft.)

How much percentage is add for dressing in rubble Soling?

The important factor here to consider here is the dressing. The dressing wastage considered is 10% . This percentage is again depend upon the size and shape of the rubble. For elongated and completely uneven shape the dressing wastage can be upto 20%.

Why is the rubble Soling done?

Rubble soling is done to prepare the uniform level surface on Hard Base or on backfilled surface to work clearly and above rubble soling PCC work will be done for plain level surface. If any level difference in base of the ground then we are doing plum concrete and rubble soling with the heap of rubble and PCC.

Why is brick soling done?

Brick Flat Soling (BFS) is mostly used in building construction and road construction. The purpose of using it as concrete bed is to make concrete bed smooth and stable. Before placing bricks, check that bed is compacted by hand rammer and by sprinkling water.

What is the difference between boulder and rubble?

In context|geology|lang=en terms the difference between boulder and rubble. is that boulder is (geology) a particle greater than 256 mm in diameter, following the wentworth scale while rubble is (geology) a mass or stratum of fragments of rock lying under the alluvium and derived from the neighbouring rock.

What is the rate of rubble Soling?

Rubble Soling Rate Analysis

Sr. No. Material Name Rate
230MM THICK RUBBLE SOLING WORK = 1 CUM
MATERIAL
1 Rubble Soling 2100
2 Murum 900

How do you calculate flat soling of a brick?

Brick require for 1 square meter one brick flat soling=32nos. 3. Brick require for 1 squre meter one layer herring bone bond soling=52nos.

What is Murrum?

Meaning of murrum is the disintegration of rock i.e., fragments of rock, that’s why it does not rock. Usually, shale or laterite rock is used in disintegration. Murrum is practically used for filling work in case of road construction and in an embankment.

Why do we do rubble Soling?

What do you need to know about rubble Soling?

Soling is the process of hand packing rubble stones one adjacent to another, to provide a stable base to the foundation and footing, before concreting work. Rubble or boulder soling is done to enhance the bearing capacity of the soil, where hard strata are not available.

What is the Soling procedure for a foundation?

Home » Procedure and checklist » Rubble (boulder) soling procedure for the foundation and footing. Rubble (boulder) soling procedure for the foundation and footing. Soling is the process of hand packing rubble stones one adjacent to another, to provide a stable base to the foundation and footing, before concreting work.

When to use plum concrete and rubble Soling?

If any level difference in base of the ground then we are doing plum concrete and rubble soling with the heap of rubble and PCC. If hard the surface level of any foundation is too deep and structure on this building in lightweight then needs to do rubble soling or plum concrete.

What should be done after compaction of rubble?

After compaction, give the required slope or level and dense sub-base and the surface should present clean look. Adequate care should be taken by the contractor while laying and compacting the rubble soling to see that concrete surfaces in contact with soling are not damaged.